Offshore wind farm construction - more pictures - The Oil Drum
This transition piece is heavier than the others, and required a re-fit of the jackup barge to be installed. That refit was being done when we visited: Left: two of the legs that go down in water to lift the platform above the water when it needs to
Source: www.theoildrum.com
Leave a Reply
You must be logged in to post a comment.